Figure 2-61 Potential collision between Lateral gantry/carriage and detector lift
Large Display Monitor suspension with fixed point dual arm
General Policy
The customer is responsible for the structural analysis and mounting of the Substructure for Dual Arm
suspension in the solid ceiling (in case of a Large Display Monitor and the MAVIG suspension with fixed
point dual arm). If customer requires GEHC to mount the Substructure for Dual Arm suspension, the
customer must hire a structural engineer to design and approve the mounting method and provide
GEHC with an engineering report.
Figure 2-62 Medium Height Substructure for Dual Arm Suspension and MAVIG Suspension with Fixed
Point Dual Arm
Equipment Requirements
5750182-1EN 3
Innova
TM
IGS 6
111
Summary of Contents for Innova IGS 6
Page 9: ...Page intentionally left blank...
Page 57: ...Figure 2 11 Omega V Table dimensions Equipment Requirements 46 InnovaTM IGS 6 5750182 1EN 3...
Page 61: ...Figure 2 14 Gas box outlets Omega Table Equipment Requirements 50 InnovaTM IGS 6 5750182 1EN 3...
Page 69: ...Figure 2 22 C2 Cabinet dimensions Equipment Requirements 58 InnovaTM IGS 6 5750182 1EN 3...
Page 147: ...Page intentionally left blank Environmental Requirements 136 InnovaTM IGS 6 5750182 1EN 3...
Page 158: ...Figure 5 6 PDB Schematic CE 1 2 Electrical Requirements 5750182 1EN 3 InnovaTM IGS 6 147...
Page 159: ...Figure 5 7 PDB Schematic CE 2 2 Electrical Requirements 148 InnovaTM IGS 6 5750182 1EN 3...
Page 161: ...Figure 5 9 PDB Schematic UL 1 2 Electrical Requirements 150 InnovaTM IGS 6 5750182 1EN 3...
Page 194: ...InnovaTM IGS 6...