
SECTION 30 (Continued)
Figure 30.2 Report Generator Screen
– Page 2
NOTE: Changes made to the EVT PRO 2.0
®
Test Report Global Template will be
reflected on all unsaved and new test reports. Reports which are already saved in
memory are not changed.
SECTION 31
EVT PRO 2.0
®
HYDRAULIC HOSE AND HAND PUMP BLEEDING PROCEEDURE
Bleeding the hydraulic hoses and/or venting the hand pump, may be required as a result of
frequent use of the EVT PRO 2.0
®
due to air accumulation. Bleed the hydraulic hoses in
the following manner:
1. Connect both hydraulic hoses to the pump.
2. Interconnect the hydraulic hoses on the cylinder end.
3. Stroke the hand-pump allowing the excess air to vent into the pump tank.
4. Pump the hand pump until the air bubble clears.
5. Close the vent cap,
6. If testing, reconnect the hydraulic hoses to the lifting cylinder.
EVT PRO 2.0
®
REPORT GENERATOR
EVT PRO 2.0
®
Operations and Technical Manual (Rev 1.0
– 2016)
NOT FOR COPY OR DISTRIBUTION
Page 42
Summary of Contents for EVT-Pro 2.0
Page 10: ...EVT PRO 2 0 Operations and Technical Manual Rev 1 0 2016 NOT FOR COPY OR DISTRIBUTION Page 6 ...
Page 11: ...EVT PRO 2 0 Operations and Technical Manual Rev 1 0 2016 NOT FOR COPY OR DISTRIBUTION Page 7 ...
Page 57: ...APPENDIX INFORMATION EVT Pro 2 0 Operations and Technical Manual Rev 1 0 2016 ...