Chapter 2: Installation
18
GE-DS-82 and 82-PoE Ethernet Managed Switch User Manual
Step 4:
Follow the same steps to attach the second bracket to the opposite side.
Step 5:
After the brackets are attached to the Managed Switch, use suitable screws to
securely attach the brackets to the rack, as shown in Figure 7.
Figure 7: Mounting the GE-DS-82 in a rack
Step 6:
Follow steps 4 and 5 of the Desktop Installation section to connect the
network cabling and supply power to the Managed Switch.
SFP Transceiver Installation
This section describes how to insert an SFP transceiver into an SFP slot.
SFP transceivers are hot pluggable and hot swappable. You can insert and remove a
transceiver from any SFP port without powering down the Managed Switch, as
shown in Figure 8.
Summary of Contents for 82-POE
Page 26: ...Chapter 2 Installation 22 GE DS 82 and 82 PoE Ethernet Managed Switch User Manual ...
Page 148: ...Chapter 5 Console Management 144 GE DS 82 and 82 PoE Ethernet Managed Switch User Manual ...
Page 212: ...Chapter 6 Command Line Interface 208 GE DS 82 and 82 PoE Ethernet Managed Switch User Manual ...
Page 226: ......