Installation
QS4 Technical Reference Manual
2.23
Installing standby batteries
For batteries rated at 10 Ah
or less
1. Place the batteries in the
bottom of the control panel.
2. Wire the batteries to the
PS6.
Notes
Do not run wires through the
bottom knock-outs when
batteries are installed in the
control panel.
Battery wiring is supervised
and nonpower-limited.
Maintain a 1/4-inch
separation between power-
limited and nonpower-limited
wiring at all times.
+ –
For batteries rated greater
than 10 Ah
1. Place the batteries in a
BC-1 Battery Cabinet. The
cabinet must be mounted
within 3 ft of the control
panel, in the same room,
and connected with conduit.
2. Wire the batteries to the
PS6.
Note:
Install, maintain, and test
standby batteries in
accordance with NFPA 72.
BC-1
+
–
+ –
–
+