GBC StreamPunch Ultra/Ultra MP
02-03-2017
Adjustments/Repairs
4-119
10. Remove the backgage sensor upper and lower brackets.
11. Remove Nuts (3) and the Chip Chute.
12. Remove the old Die Rail.
Installation Procedure
1. Place the new Die Rail Assembly in position.
2. Place the Chip Chute in position and tighten the Nuts (3).
3. Place the Springs (2) in position, install the M2 Lock Washers (4), and
tighten the the M2 Screws (4).
4. Install the backgage upper and lower brackets
5. Place the the Die Rail Assembly in position.
6. Install and tighten the Screws (4) that hold that Die Rail Assembly.
When installing (4) screws that hold the die rail, use 3mm reference
holes for positioning the part. A 3mm pin can be inserted to hold the
part in position while the screw is tightened.
7. Tighten the Screws (2) that hold the Dieset Recognition Bracket.
8. Install the upper and lower Alignment sensor brackets.
9. Connect the Back Gage Sensor Board and place the wires in the
Cable Clamps.
10. Do ARP 3.1 to install the Punch Module.
11. Do ADJ 1.6 Die set recognition board adjustment.
12. Do ARP 1.6 to install the Rear Cover.
13. Connect the Power Cord.
Summary of Contents for StreamPunch Ultra
Page 2: ...Service Manual 11 05 2018 GBC StreamPunch Ultra Ultra MP ii ...
Page 9: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 Service Manual ix Notes ...
Page 17: ...Service Call Procedures 02 03 2017 GBC StreamPunch Ultra Ultra MP 1 8 Notes ...
Page 66: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 RTPS 2 49 Notes ...
Page 231: ...GBC StreamPunch Ultra Ultra MP 02 03 2017 Adjustments Repairs 4 151 Notes ...
Page 354: ...General Procedures and Information 11 05 2018 GBC StreamPunch Ultra Ultra MP 6 80 Notes ...
Page 356: ...Wiring Data 05 10 2018 GBC StreamPunch Ultra Ultra MP 7 2 This page intentionally left blank ...
Page 359: ...GBC StreamPunch Ultra Ultra MP 05 10 2018 Wiring Data 7 5 Plug Jack connectors ...
Page 369: ...Installation Instructions 02 03 2017 GBC StreamPunch Ultra Ultra MP 8 10 Notes ...