General Procedures and Information
11-05-2018
GBC StreamPunch Ultra/Ultra MP
6-44
GP 6.3 Undock the Punch (Moving the punch to Service position)
Use this procedure to move the punch to Service position
1. Unplug the AC power cord.
2. Unplug the Communications cable.
3. Unscrew the locking screw.
4. Pull on the release tab until the docking mechanism unlatches.
5. Follow the instructions for undocking the downstream device.
After undocking,
GP 6.4 Dock the punch (Moving the punch to Operating position)
Use this procedure to move the StreamPunch Ultra/Ultra MP to operating
position.
1. Slide the punch to Operating position, ensure the positioning
stud in the upstream device slides into the positioning plate.
2. Slide in the upstream and downstream docking mechanisms and
install the locking screws.
3. Connect the Communications cable.
4. Connect the AC power cord.
5. Run a small test job in both Punch and Bypass mode to ensure
the machine is working properly.
Summary of Contents for StreamPunch Ultra
Page 2: ...Service Manual 11 05 2018 GBC StreamPunch Ultra Ultra MP ii ...
Page 9: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 Service Manual ix Notes ...
Page 17: ...Service Call Procedures 02 03 2017 GBC StreamPunch Ultra Ultra MP 1 8 Notes ...
Page 66: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 RTPS 2 49 Notes ...
Page 231: ...GBC StreamPunch Ultra Ultra MP 02 03 2017 Adjustments Repairs 4 151 Notes ...
Page 354: ...General Procedures and Information 11 05 2018 GBC StreamPunch Ultra Ultra MP 6 80 Notes ...
Page 356: ...Wiring Data 05 10 2018 GBC StreamPunch Ultra Ultra MP 7 2 This page intentionally left blank ...
Page 359: ...GBC StreamPunch Ultra Ultra MP 05 10 2018 Wiring Data 7 5 Plug Jack connectors ...
Page 369: ...Installation Instructions 02 03 2017 GBC StreamPunch Ultra Ultra MP 8 10 Notes ...