GBC StreamPunch Ultra/Ultra MP
02-03-2017
Adjustments/Repairs
4-87
ARP 3.6 Punch Motor Belt Replacement (Timing Belt)
PARTS LIST ON PL 4.1
Use this procedure to remove and install the Punch Motor Belt.
•
(Belt, Timing, Punch Pulley, 115V)
•
Belt, Timing, Punch Pulley, 230V
WARNING
Do not perform Repair activities with the power on or electrical
power supplied to the machine. Some machine components contain
dangerous electrical voltages that can result in electrical shock and
possible serious injury.
1. Disconnect the Power Cord.
2. Do ARP 1.6 to remove the Rear Cover.
3. There is no need to uninstall the punch module, however for ease of
operation it is a good idea to uninstall it using ARP 3.1
4. Remove the JE-10 E-Ring.
5. Remove the Nylon Washer.
6. Remove the Ball Bearing.
7. Remove the Screws (2) and the Bearing Bracket.
8. Remove the old Belt.
9. Place the new Belt around the Timing Pulley on the Punch Motor and
the Clutch pulley.
Belt
Clutch Pulley
Summary of Contents for StreamPunch Ultra
Page 2: ...Service Manual 11 05 2018 GBC StreamPunch Ultra Ultra MP ii ...
Page 9: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 Service Manual ix Notes ...
Page 17: ...Service Call Procedures 02 03 2017 GBC StreamPunch Ultra Ultra MP 1 8 Notes ...
Page 66: ...GBC StreamPunch Ultra Ultra MP 11 05 2018 RTPS 2 49 Notes ...
Page 231: ...GBC StreamPunch Ultra Ultra MP 02 03 2017 Adjustments Repairs 4 151 Notes ...
Page 354: ...General Procedures and Information 11 05 2018 GBC StreamPunch Ultra Ultra MP 6 80 Notes ...
Page 356: ...Wiring Data 05 10 2018 GBC StreamPunch Ultra Ultra MP 7 2 This page intentionally left blank ...
Page 359: ...GBC StreamPunch Ultra Ultra MP 05 10 2018 Wiring Data 7 5 Plug Jack connectors ...
Page 369: ...Installation Instructions 02 03 2017 GBC StreamPunch Ultra Ultra MP 8 10 Notes ...