22
GAUI
TAI SHIH HOBBY CORPORATION
GAUI
TAI SHIH HOBBY CORPORATION
尾拉桿夾座
尾拉桿頭
將P.20的尾拉桿穿入至尾拉桿夾座內並鎖上尾拉桿頭。
調整尾拉桿夾座與尾管同一直線,鎖緊
M
3x12
並確認尾拉桿夾座與不鏽鋼滑套距離相等。
尾拉桿安裝
尾拉桿頭
M
3x12__________
3
M3
x12
等距
等距
M3x8___________
6
Bearing
_6x13x5___
1
將軸承置入馬達軸心座後連同機身強化板左右一起
組裝。
含上M3x8螺絲並於 P.23 調整馬達齒間
隙為0.1mm後再將螺絲鎖緊。
M3x8
B6x13x5
機身強化板組裝
螺絲均需上止滑劑
All Screws should
be applied with thread lock.
機身強化板(左)
馬達軸心座
Tail Push Rod Assembly
Reinforced Plate Assembly
Insert the tail push rod through the tail control guides,
then fix and tighten the ball link. Adjust the tail control
guide to be straight with tail boom, then tighten the
M3x12 screws, confirm the distance of the stainless
sliding sleeves as illustrated below.
Insert the bearing into the motor shaft bearing mount,
then assemble the bearing mount together with the
reinforced plates.
Fix the M3x8 screws, and adjust the
gear mesh to about 0.1mm as illustrated
in P.23, then tighten the screw.
Ball link
Ball link
Tail control guide
Motor shaft bearing mount
Reinforced plate (Left)
Equal-space
Equal-space