![background image](http://html1.mh-extra.com/html/gaui/x7-flybarless/x7-flybarless_instruction-manual_3804311017.webp)
15
GAUI
GAUI
TAI SHIH HOBBY CORPORATION
TAI SHIH HOBBY CORPORATION
將前傘齒輪定位銷4.5mm 處壓入14T前傘齒輪至底。
將軸承置入軸心固定座並點上瞬間膠。
並注意組裝方向
組裝完成後將傳動軸心置入尾管內。
將尾傳動軸承墊圈置入尾傳動軸桿
並以瞬間膠或缺氧膠固定,確認
距離與上圖相同。
Bearing_
12x18x4__
2
Bearing_
8x14x4___
2
M2x12__________
2
N2X4___________
2
B12x18x4
B12x18x4
280mm
280mm
B8x14x4
Oring
大洞
M2x12
N2x4L
前傘齒輪定位銷
14T前傳動傘齒輪
尾前傳動齒輪箱
4.5mm
4mm
傳動軸心組裝
尾前傳動齒組裝
尾傳動軸桿組
Torque Tube with bearing
Torque tube head
Front bevel gear case
14T front bevel gear
Front bevel gear fixing pin
傳動軸桿頭
Torque Tube Assembly
Front Bevel Gear Assembly
Front
Insert the bearing into the bearing holder and
apply CA glue to fix it, pay attention to the
direction of the holder.
When torque tube assembly is done,
install the torque tube to the tail boom.
Assemble the bearing and
bearing holder, then install it on
the torque tube, applyCA glue
to fix it. Confirm the distance is
as illustrated.
Insert the fixing pin (4.5mm side) into the 14T
front bevel gear.