![background image](http://html1.mh-extra.com/html/gaui/x7-flybarless/x7-flybarless_instruction-manual_3804311022.webp)
20
GAUI
TAI SHIH HOBBY CORPORATION
GAUI
TAI SHIH HOBBY CORPORATION
製作兩支尾支撐桿,使用AB黏著劑黏合兩端
的支撐稈頭並確認黏合時需呈同方向(1-1)。
720 mm
1-1
支撐桿頭
使用瞬間膠將拉桿鋁套固定於拉桿前端處,
鎖上尾端的尾拉桿頭。
拉桿絽套
不鏽鋼滑套
187mm
200mm
195mm
尾拉桿頭
將不鏽鋼滑套套入尾拉桿內並調整至
相同距離後使用瞬間膠黏合。
支撐桿組立
尾拉桿組立
Tail Boom Support Assembly
Tail Push Rod Assembly
Assemble two tail boom support sets,
apply epoxy glue on both sides of the boom
support, confirm the direction of the head.
Fix the aluminium sheath on the top of the
push rod by applying CA glue on it. Install
and tighten the ball link for push rod.
Insert the stainless sliding sleeves
on the push rod and adjust its distance
as illustrated, then apply CA glue for
fixing it.
Ball link
Boom support head
Aluminium sheath for
push rod
Stainless sliding sleeve