Completion Check List
The information below will help verify proper installation of the TopKAT System. Review it
before testing the pumps and/or dispensers in the manual, override position.
1
Is the optional data terminal located in a clean, office-type environment?
2
Is the optional external modem located in an office-type environment or a protective
enclosure?
3
Is all the wiring in metal conduit? (See
“Conduit Requirements” on page 15
). The only
exception to the metal conduit rule is RS-422 as noted in
“RS-422 - Short Haul Modems” on
.
4
Is the AC and DC wiring in separate conduits, troughs, etc.- except as noted in
5
Is the system/peripheral equipment on a separate dedicated breaker? (See
6
Is the system grounded properly? (See
“Power Requirements” on page 17
7
Is the correct gauge wire installed for the communication lines? (
8
Are the communication lines under the maximum allowable distance.
• RS-232: 100 feet
• RS-422: 1500 feet except as noted in
“RS-422 - Short Haul Modems” on page 24
9
If the system has an internal modem, is the phone line installed? (
)