Series 9800 Field Installation
Port Communication Wiring
Page 114
MDE-4319A TopKAT Fuel Managment System Installation Manual · November 2005
Figure 8-5: RS-232 - Gasboy Termination Box
Note: In the TopKAT, the green connector goes to P4 on the communication board for port 2
and P6 for port 3. The K1 & K2 jumper for the port being used should be set to RS-232.
See
“Terminal Block ID” on page 26
for the location of K1 & K2 jumpers.