![Gasboy 9822Q Installation & Operation Manual Download Page 44](http://html1.mh-extra.com/html/gasboy/9822q/9822q_installation-and-operation-manual_568212044.webp)
GASBOY Series 9820Q
38
MDE-4339 9820Q ASTRA Installation/Operation • July 2004
1.
Check meter registration by delivering product to a reliable, accurate, 50 or 100 gallon prover.
2.
Remove the seal wire from the locking pin.
3.
Remove locking pin and turn wheel to adjust measurement. Turn clockwise to decrease the
amount in the prover to match the display, turn counter-clockwise to increase the amount in
the prover to match the displayed. Moving the wheel one hole position changes the
calibration by 2/3 cubic inch per 5 gallons. To change by half of this amount, you may utilize
the alternate locking pin hole on the opposing side of the calibration wheel.
4.
Repeat process until volume in prover and amount recorded are within tolerance.
5.
After calibration is complete, reinstall locking pin and secure in place using a seal wire.
Summary of Contents for 9822Q
Page 1: ...Series 9820Q ASTRA Installation Operation Manual MDE 4339 formerly 035090...
Page 18: ...GASBOY Series 9820Q 12 MDE 4339 9820Q ASTRA Installation Operation July 2004...
Page 22: ...GASBOY Series 9820Q 16 MDE 4339 9820Q ASTRA Installation Operation July 2004...
Page 32: ...GASBOY Series 9820Q 26 MDE 4339 9820Q ASTRA Installation Operation July 2004...