background image

MDE-4864B Gasboy® 9820 Pump Interface Kits Installation Instructions · March 2022

Page 7

Installation of the Gasboy 9820 Pump Interface Kit

8

Feed the connector end of the cable into the round terminal bracket mounting hole at the 
bottom-right of the chassis. Position the terminal block with the red wire in position 1. Secure 
the terminal block using the #8-32 hardware.

Figure 4: Installing the Terminal Block

Chassis

Cable

#8-32 Hardware

9

Carefully route the cable and install the connector on P1 of the new I/F PC Board.

10

Return the chassis to the cabinet.

11

Reconnect all the wiring.

12

Connect the new field wiring to the new terminal block. For more information refer to

 

MDE-4567 9120K & 9820K Series AST Pumps Installation and Operation Manual

.

13

Turn on the MICRO and FEED circuit breakers.

Summary of Contents for 9820

Page 1: ...llation of the kit Flat tip Screwdriver Cross tip Screwdriver Standard Socket set Parts List The following table lists the parts included in the Pump Interface Kits Sr No Description Part Number Quant...

Page 2: ...n and Operation Manual Gasboy Atlas Pumps Dispensers MDE 4652 Atlas 9800 Electronics Field Installation Instructions Gasboy Atlas Pumps Dispensers Abbreviations and Acronyms Term Description DEF Diese...

Page 3: ...lations must be followed Failure to install inspect maintain or service this equipment in accordance with these codes regulations and standards may lead to legal citations with penalties or affect the...

Page 4: ...n IMPORTANT Oxygen may be needed at scene if gasoline has been ingested or inhaled Seek medical advice immediately Lockout Tagout Lockout Tagout covers servicing and maintenance of machines and equipm...

Page 5: ...m Refer to MDE 4567 9120K 9820K Series AST Pumps Installation and Operation Manual and your Fuel Management System Installation Manual before proceeding To install the Gasboy 9820 Pump Interface Kit p...

Page 6: ...Assembly Loosen the Screws Tag the Wires 4 Note down the wiring or tag all the wires that are connected to the terminal blocks Remove all the wires from the terminal blocks 5 If the model 9820 Pump co...

Page 7: ...ed wire in position 1 Secure the terminal block using the 8 32 hardware Figure 4 Installing the Terminal Block Chassis Cable 8 32 Hardware 9 Carefully route the cable and install the connector on P1 o...

Page 8: ...fer to MDE 4652 Atlas 9800 Electronics Field Installation Instructions The table below shows the jumper settings and terminal block positions to connect at the bottom of the register based on the conf...

Page 9: ...puts from a single pulser Figure 5 Dual channel Single hose Pulse out I F REMOTE REGISTER Notes 1 All wiring and conduit runs must conform with all building fire codes all Federal State and Local code...

Page 10: ...and are for identification purposes only Use of these names logos and brands does not imply endorsement 2022 GASBOY 7300 West Friendly Avenue Post Office Box 22087 Greensboro North Carolina 27420 Phon...

Reviews: