Ganz
Thermal
Series User Manual
13
Figure 7: Recommended Tool Kit
Figure 8:
Recommended
Analog Tools
4.4
PREPARING THE CABLE
1. Disconnect power from the exposed cable(s) of the standard Bracket.
2. Take the number 2 Phillips head screwdriver and pierce the membrane of the cable
gland.
3. If needed, pierce 2 smaller holes on the membrane of the cable gland for AC/DC
power wires.
4. Remove the electric nut from the sealing gland.
5. Place the O-ring (Orange) on the threaded end of the cable gland. This is necessary
to insure a good seal for IP66.
6. Cut off the RJ-45 connector if using existing Ethernet cable.
7. Feed existing or new cable(s)from the standard Axis or Pelco Bracket through the
components in the following order:
a. 4 Hole Mount Adapter (4 hole flat surface facing the mating bracket) if required
b. 3 Hole Base Mount (Flat side first for mating 3 Hole Bracket)
c. Electrical Nut (Convex side) of the supplied Cable Sealing Gland
d. Bottom of the IP Camera body through the back hole below the connectors
Securing for IP66 (POE only)
1. Slide the Ethernet cable through the threaded end of the cable sealing gland, with
Orange O-Ring installed.
2. Measure approximately 4.5 inches of cable slack from the end of the cable to the
rubber grommet of the sealing gland. Use a scale to measure the length.
3. Attach one open end wrench onto the flange of the cable gland and tighten the
compression nut, with the second open wrench, to approximately 50-55 in-lbs. of
torque
4. Assemble a new RJ45 head to the Cat 5 Ethernet Cable