Galvanic Applied Sciences USA, Inc.
101 Billerica Ave, Bldg. 5, Suite 104.
North Billerica, MA. 01862
Tel: 978-848-2701
Fax: 978-848-2713
Email: [email protected]
18
Pic
tu
re
1
5
19.
Push the optical assembly into the holder.
20.
Tighten Allen screws (3x)
Important note:
Please pay attention to the position of the optical
assembly. The three grooves on the outside of the
barrel must be in line with the three Allen screws.
21.
Reconnect the wires of lamp / detector cable and perform a
lamp test.
Pic
tu
re
1
6
Pic
tu
re
1
7
22.
Push lamp / detector arm to the thread.
23.
Tighten lamp / detector arm
24.
Tighten cable gland
Pic
tu
re
1
8
Pic
tu
re
1
9
25.
Screw in Allen screws and / or air purge connectors
26.
Functional test and eventual calibration.
Replacement interval
The interval to replace the gaskets depends on the specific application.
The replacement cycle depends on process pressure, process temperature, sealing material and product
characteristics. In worst case (high temperature, high pressure, aggressive medium) the gaskets must be
replaced every month. Under normal conditions the gaskets should be replaced every year. The maximum
lifetime in easy applications can go up to 2 years.
We strictly recommend that the customer establishes a maintenance interval based on local conditions. If
you have any questions or if you require more information contact Metrisa.