GALA SYNERGIC 5000
8
2.3. INSTALLATION OF COOLED SYNERGIC GALA SYSTEM.
K
L
M
D
O
I
B
C
F
E
A
C
B
D
I
O
G
H
J
O
I
Electrical connection of power source
K- Supply hose
L- Connection plug.
Installation of welding shielding gas circuit
E- Gas intake hose to power source.
F- Pressure reducing valve of gas flow control.
A- Connection extension lead (cooled).
B- CONTROL hose.
C- Shielding GAS.
D- POSITIVE supply pole.
O- Cold-water pipe (BLUE)
I- Hot-water pipe (RED)
Installation of welding circuit elements.
G- Cooled welding torch.
H- Reactance taps.
J- Welding earth clamp.
WCS cooling module connection.
M- Electrical connection cable of cooling module.
O/I- Hot (RED) and cold (BLUE) water pipes.
Extension connection to power
source.
Extension connection to wire-feed unit.
Earth cable connection (J) to
reactance taps (H).
C (GAS)
B (CONTROL)
D (+ WELDING)
C (GAS)
B (CONTROL)
D (+ WELDING)
I (HOT, RED)
O (COLD, BLUE)
L1: MINIMUM
L2: MEDIUM
L3: MAXIMUM