GALA SYNERGIC 5000
5
2. TRANSPORT AND INSTALLATION.
Elevation system.
Knocks and sudden movements must be avoided when
transporting the equipment. The transport position will be shown
by arrows on the packaging. In any case, the packaging must be
protected from water.
The power source has some lifting eyes so that it can be lifted
with a crane. To assemble the modular system follow the
assembly instructions enclosed with the transport trolley or bottle
support. The assembly will be carried out by suspending the
equipment as shown in figure 2.
DO NOT LIFT EQUIPMENT WITH GAS BOTTLE MOUNTED
ASSEMBLY PLAN FOR GALA SYNERGIC 5000 EQUIPMENT
8 TUERCAS M10
8 GROWERS M10
8 ARANDELAS PLANAS
n
10
4 TORNILLOS M8
4 GROWERS M8
4 ARANDELAS PLANAS
n
8
M10
n
10
2 TORNILLOS M10
2 TORNILLOS M10
2 TORNILLOS M10
2 ARANDELAS
PLANAS DE 20
2 PASADORES ALETAS
M6
M6
n
6
n
6
M6
M6
M10
n
10