P a g e
|
32
Step
2e:
Connect the PV Wires...
Connect the module cables to the mating connectors on the
MLPE.
Step 2f:
Ensure Proper Wire Management....
It is critical to ensure that no wires come in contact with
any of the Side Flashing of the array. Secure the wires to the MLPE bracket and module frame
as needed. See
Figure 30
.
Note
Do not exceed the cables’ minimum bend radius. See NEC for details.
MLPE
Bracket
WEEB
®
Grounding
Assembly
Figure 28 Attach WEEB Ground Assembly to MLPE
Wiring
Connectors
Figure 29 Attach connectors