![GAF DecoTech Installation Instructions Manual Download Page 45](http://html.mh-extra.com/html/gaf/decotech/decotech_installation-instructions-manual_555829045.webp)
P a g e
|
45
Notes
In high snow load areas, additional Top Flashing Supports may be required.
Bend each 38” DynoBond™ Jumper into a U-shape and pass it through the slot in one of the Top Flashing
Supports. The 76” DynoBond™ Jumper is further routed through one of the MLPE Weeb® Grounding Lugs.
See Figure 52. Further details on the system grounding can be found in the grounding Section on Page 17.
Attach the 76” DynoBond™ Jumper to the copper grounding wire at a WEEB™ Grounding Lug
(
Figure 53
). Torque the terminal screw to 85 inch-pounds (9.6 Nm).
Top Flashing
Supports
within the
Array
76” DynoBond™
Route Wires Through
This Opening
Nail Only Within 1" (25 mm) from the Edge.
Top
Flashing
Support
¼"-½"
Center the Top Flashing
Support on the Overlap
Position the Corner Top
Flashing Support as Shown
DynoBond™
Grounding Jumper
Bare Copper
Grounding Wire
1"
38” DynoBond™
Figure 51 Locations of Top Flashing Supports
Figure 52 Position DynoBond Jumpers
Figure 53 WEEB® Grounding Lug Connection