Figure 71 Configuration B - Step 2
Figure 72 Configuration B - Step 3
Figure 70 Trimming Left Counterflashing
Step 2:
Install the shingles, underlayment, Starter Bar, Solar Module Assembly, Step Flashing, and the
field-trimmed Counterflashing as shown in Figure 71.
`
Step 3:
Snap a chalk line to align the Adjustable Feet to the adjacent Starter Bar as shown in Figure
72. Leave a small (approximately 1/8 inch) gap between the Inside Counterflashing and the
Starter Bar. Attach the Starter Bar to the deck.
Step 4:
Align and attach Solar Module Assemblies 2 and 3 as shown below. Complete the array following the
standard installation procedures.
Trimmed Right
Counterflashing
Trimmed Left
Counterflashing
Chalk Line
Underlayment
1/8” Gap