SuperPro Series Installation Manual
Overview
The general steps for installing a Multi-Media Receptacle are:
•
Install open back ½” deep single gang outlet boxes or mud rings at each location.
•
Pull and secure
SpeedWrap
Cable at each location.
•
Allow Sheetrock to be installed.
•
Retrieve
SpeedWrap
Cable.
•
Complete terminations.
•
Install faceplate.
A basic Multi-Media Receptacle assembly is illustrated in Figure 18 below.
Caddy MPLS
mudring
Sheetrock wall
FutureProof
cabling
RJ-45
Fiber Optic ST
Coaxial "F"
CAT5
Multimode
Fiber
RG-6
Coax
faceplate
62.5
Fig. 18: Basic Receptacle Assembly
FutureSmart
Page 23