TECDIS Installation Manual
Page 16
1.2 Processor Unit
The processor unit can be mounted inside on bridge console or other suitable space on the bridge.
When selecting a mounting location, keep in mind the following points:
1.
Select a location where vibrations are down to a minimum, try to avoid vibrations by
adding strength to console where the processor is about to be installed.
2.
Locate the unit away from heat sources because of heat that can build up inside the
cabinet.
3.
Locate the equipment away from places subject to water splash and rain.
4.
Leave sufficient space on the sides and rear of the unit to facilitate maintenance and
interconnection cabling.
5.
Navigator shall update charts in the processor weekly. Mount the processor at a
location that enables the navigator easy access to front doors of the processor. It
must be possible to open CD drawer of processor without obstructions.
6.
The power switch shall be easily to access, front of processor may be flush mounted
in the console to enable access or other means to be provided for easy access.
7.
Service key dongle must be possible to remove and insert to enable service technician to
enter service mode.
8.
MOXA 8-port RS-422 connection box to be arranged close to processor to enable easy
interconnection. MOXA is supplied with 1,5 m interface cable between processor and
connection box.
Do not protrude the housing with screws to fasten the processor. Straps should be used to fasten
the processor at its location, without protruding the housing. Straps are not supplied and must be
arranged locally. Check that front doors of processor can easily be opened and that cables can
easily arranged in the back of the processor.
The processor is suitable for rack-mounting, 19” width rack. Height is 4U.
Summary of Contents for TECDIS
Page 8: ...TECDIS Installation Manual Page 7 Installation Overview...
Page 18: ...TECDIS Installation Manual Page 17 Outline dimensions for HT 405P4 TEL A1 All figures in mm...
Page 22: ...TECDIS Installation Manual Page 21 Furuno RCU 018 Control Unit outline Flush mount...
Page 32: ...TECDIS Installation Manual Page 31 2 1 Wiring diagram HT 405P4 TEL A1...
Page 33: ...TECDIS Installation Manual Page 32 2 2 Signal distribution diagram internal data flow...
Page 35: ...TECDIS Installation Manual Page 34 2 4 Ethernet connectors and cable...
Page 36: ...TECDIS Installation Manual Page 35 2 5 Other connectors...
Page 64: ...TECDIS Installation Manual Page 63 This page is intentionally left blank...
Page 75: ...TECDIS Installation Manual Page 74 6 4 Installation Notes...
Page 76: ...TECDIS Installation Manual Page 75...
Page 79: ...TECDIS Installation Manual Page 78 This page is intentionally left blank...