4-1
Chapter 4
Power and startup
4
This chapter has the following sections:
•
Power up
4.1
Power cables
An AC power cable for the GMU/ACU is included in the delivery.
4.2
Power up
4.2.1
To connect the power cable to the ACU and GMU
1. Connect the power cable to the GMU.
2. Connect the power cable to the GMU.
4.2.2
Power-up procedure
1. Switch on the ACU. The unit starts up and goes through an initialization procedure:
• ACU POST
• Antenna Initializing
• Antenna POST
• READY
This may take some time (up to a couple of minutes).
2. The FV-110GX is ready to be calibrated (for first time power up) or receive data from
the GMU (when in normal operation).
Figure 4-1: ACU - to connect power to DC Input
Figure 4-2: GMU - to connect AC power
Summary of Contents for FV-110GX
Page 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Page 16: ...xiv This page is intentionally left blank ...
Page 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Page 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Page 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Page 164: ...Supported commands C 10 This page is intentionally left blank ...
Page 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Page 166: ...OEM declaration D 2 D 1 OEM declaration ...
Page 173: ...OD 1 30 Jul 2018 H MAKI ...
Page 174: ...OD 2 30 Jul 2018 H MAKI ...
Page 175: ...OD 3 2 Oct 2018 H MAKI ...
Page 176: ...OD 4 2 Oct 2018 H MAKI ...
Page 178: ......
Page 186: ......