Installation check list: ACU and GMU, connectors and wiring
6-2
6.2
Installation check list: ACU and GMU, connectors
and wiring
Step
Task
Verification and further information
Done
1.
Check that the ACU is grounded correctly,
using the mounting bolts and washers.
See
To ground the ACU
on page 2-27
and
Ground and RF protection
on page A-1.
2.
Make sure you strain relieved the cables at
the ACU.
See
To install the ACU
on page 2-27.
3.
Make sure that the GMU is mounted close to
the ACU (preferably next to it).
See
To install the modem
on page 2-28.
4.
Check that the ADU antenna N-connector is
properly connected with the 50 Ohm RF
cable.
Visual inspection of the cover plate at the
bottom of the ADU. See the figure
Connecting the ADU cable (for the new
antenna)
on page 2-21.
5.
Check that the ACU antenna N-connector is
properly connected with the 50 ohm RF
cable.
Visual inspection of the connector panel of
the ACU.
6.
Check that the ACU's
Rx Out
is connected
to the GMU Rx in using the included 1 m F-F
75 ohm cable.
Visual inspection of the connector panel of
the ACU and the VSAT modem. See the
figure
Connection between ADU, ACU and
GMU
on page 2-29.
7.
Check that the ACU's
Tx In
is connected to
the GMU Tx out using the included 1 m F-F
75 ohm cable.
Visual inspection of the connector panel of
the ACU and the VSAT modem. See the
figure
Connection between ADU, ACU and
GMU
on page 2-29
8.
Check that the ACU's
RS-232
is connected
to the GMU
RS-232
using the included serial
cable.
Visual inspection of the connector panel of
the ACU and the VSAT modem. See the
figure
Connection between ADU, ACU and
GMU
on page 2-29
9.
Check that the ACU's
RS-232
is connected
to the GMU
RS-422
using the included serial
cable.
Visual inspection of the connector panel of
the ACU and the VSAT modem. See the
figure
Connection between ADU, ACU and
GMU
on page 2-29
10.
Check that the ACU's NMEA 0183
connector is connected to the NMEA 0183
bus of the vessel using the included multi-
connector
Visual inspection of the connector panel of
the ACU connector. See Table 3-4 on
page 3-3.
11.
Check that the power cable is plugged into
the ACU and that AC power is available.
Visual inspection.
12.
Check that the AC power cable is plugged
into the GMU and that AC power is
available.
Visual inspection.
Table 6-2: Installation check list: ACU, connectors and wiring
Summary of Contents for FV-110GX
Page 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Page 16: ...xiv This page is intentionally left blank ...
Page 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Page 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Page 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Page 164: ...Supported commands C 10 This page is intentionally left blank ...
Page 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Page 166: ...OEM declaration D 2 D 1 OEM declaration ...
Page 173: ...OD 1 30 Jul 2018 H MAKI ...
Page 174: ...OD 2 30 Jul 2018 H MAKI ...
Page 175: ...OD 3 2 Oct 2018 H MAKI ...
Page 176: ...OD 4 2 Oct 2018 H MAKI ...
Page 178: ......
Page 186: ......