2. WIRING
2-10
TB902
Clamp
Antenna unit, cover removed (left-hand side)
7. Determine the length of the cores considering their location on the terminal board TB902,
and then connect cores to TB902 by using the terminal opener.
8. Reattach the antenna cover (torque: 7.65 N
·
m).
9. Cover the gland junction with putty for waterproofing.
Summary of Contents for FAR-2827W
Page 21: ...1 MOUNTING 1 11 Mounting of antenna unit ...
Page 34: ...1 MOUNTING 1 24 This page is intentionally left blank ...
Page 86: ...3 SETTING AND ADJUSTMENT 3 22 This page is intentionally left blank ...
Page 106: ...4 INSTALLING OPTIONAL EQUIPMENT 4 20 This page is intentionally left blank ...
Page 132: ......
Page 133: ......
Page 134: ...Jan 24 07 R Esumi ...
Page 135: ......
Page 136: ...May17 07 R Esumi ...
Page 137: ......
Page 138: ......
Page 139: ...Jan 18 08 R Esumi ...
Page 140: ...Apr 23 07 R Esumi ...
Page 141: ...Apr 23 07 R Esumi ...
Page 142: ...Apr 23 07 R Esumi ...
Page 143: ...Apr 23 07 R Esumi ...
Page 144: ...Apr 23 07 R Esumi ...
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......