1. MOUNTING
1-21
1.4 Processor
Unit
Mounting considerations
When selecting a mounting location, keep in mind the following points:
•
Locate the processor unit away from heat sources because of heat that can build up
inside the cabinet.
•
Locate the equipment away from places subject to water splash and rain.
•
Leave sufficient space at the sides and rear of the unit to facilitate maintenance.
•
A magnetic compass will be affected if the processor unit is placed too close to the
magnetic compass. Observe the compass safe distances on page ii to prevent deviation
of a magnetic compass.
Mounting procedure
1. Fix the unit with four M6 bolts, or tapping screws.
23.5
340±1
378
385
409
350±1
#50
2-
φ
7 FIXING HOLES
R3.5
370±1
7
2-FIXING NOTCH
Floor mounting or bulkhead mounting
Note:
If you fix the unit, cable entry upside, never remove the screw M3x10 that joints
the upper case assy. and lower case assy. of the processor unit.
Screw
M3x10
Upper case assy.
Lower case assy.
Never remove this screw.
Processor unit
Summary of Contents for FAR-2827W
Page 21: ...1 MOUNTING 1 11 Mounting of antenna unit ...
Page 34: ...1 MOUNTING 1 24 This page is intentionally left blank ...
Page 86: ...3 SETTING AND ADJUSTMENT 3 22 This page is intentionally left blank ...
Page 106: ...4 INSTALLING OPTIONAL EQUIPMENT 4 20 This page is intentionally left blank ...
Page 132: ......
Page 133: ......
Page 134: ...Jan 24 07 R Esumi ...
Page 135: ......
Page 136: ...May17 07 R Esumi ...
Page 137: ......
Page 138: ......
Page 139: ...Jan 18 08 R Esumi ...
Page 140: ...Apr 23 07 R Esumi ...
Page 141: ...Apr 23 07 R Esumi ...
Page 142: ...Apr 23 07 R Esumi ...
Page 143: ...Apr 23 07 R Esumi ...
Page 144: ...Apr 23 07 R Esumi ...
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......