1. INSTALLATION
1-14
18. Check that fore marks are aligned, and fasten hex. nut (17), spring washer (18)
and hex. bolt (19) tightly.
19. Fasten hex. nut (20), spring washer (21) and flat washers (22) removed at step 4
to stud bolt on the seachest cap.
The distance between the seachest cap (4) and flange (7) must be 5 mm.
How to open the gate valve
When you open or close the gate valve, unfasten two nuts shown below to rotate the
handle. Then, fasten nuts to fix the handle.
-M12 hex. nut (20)
-M12 spring washer (21)
-M12 flat washer (22)
Fore mark
(at the bottom
of the transducer)
5 mm
Flange (7)
Seachest cap (4)
Summary of Contents for DS-60
Page 51: ...APPENDIX 1 CALIBRATION AP 3 ...
Page 59: ...8 Mar 2010 Y NISHIYAMA D 1 ...
Page 60: ...18 Dec 2012 Y NISHIYAMA D 2 ...
Page 61: ...18 Dec 2012 Y NISHIYAMA D 3 ...
Page 62: ...D 4 30 Jun 2015 H MAKI ...
Page 63: ...D 5 30 Jun 2015 H MAKI ...
Page 64: ...1 Jul 2011 Y NISHIYAMA D 6 ...
Page 65: ...29 Mar 2011 Y NISHIYAMA D 7 ...
Page 66: ...29 Mar 2011 Y NISHIYAMA D 8 ...
Page 67: ...D 9 30 Jun 2015 H MAKI ...
Page 68: ...D 10 30 Jun 2015 H MAKI ...
Page 69: ...D 11 15 Apr 2016 H MAKI ...
Page 70: ...D 12 15 Apr 2016 H MAKI ...
Page 71: ...D 13 15 Apr 2016 H MAKI ...
Page 72: ...D 14 15 May 2015 H MAKI ...