ii
TABLE OF CONTENTS
1. SYSTEM CONFIGURATION ............................................................................ 1
2. EQUIPMENT LISTS .......................................................................................... 2
3. MOUNTING THE EQUIPMENT
3.1 Mounting the Hull Unit and Receiver Unit ........................................................................3
3.2 Mounting the Display Unit/Sub-display Unit .....................................................................9
3.3 Mounting the Transmitter Unit........................................................................................10
3.4 Mounting the Interface Unit............................................................................................10
3.5 Mounting the FNZ Joint Box ..........................................................................................10
3.6 Grounding the Equipment ............................................................................................11
4. WIRING
4.1 Cable Configuration.......................................................................................................12
4.2 How to Use the Crimping Tool, Pin Extractor.................................................................13
4.3 Location of Connectors ................................................................................................14
4.4 Fabricating Cables, Assembling Connectors .................................................................15
4.5 Connection of Transducer Cables..................................................................................23
4.6 Connection of Interface Unit CS-120A .........................................................................24
4.7 Connection of Sub-display Unit CSH-236/236F (Option) ...............................................29
4.8 Synchronizing Transmission with Other Sonars, Echo Sounders...................................30
4.9 Interlocking Operation with Other Sonar ........................................................................32
5.
CHANGING
POWER SPECIFICATIONS ...................................................... 34
6. ADJUSTMENT AND CHECK
6.1 Hull Unit Check..............................................................................................................35
6.2 Heading Adjustment ......................................................................................................36
6.3 DIP Switch Setting in the Display Unit ...........................................................................37
6.4 Setting and Adjustment of the Interface Unit CS-120A...................................................38
7. PROCESSOR UNIT CSH-235/235F ............................................................... 42
SPARE PARTS/INSTALLATION MATERIALS/ACCESSORIES .................... A-1
OUTLINE DRAWINGS ...................................................................................... D-1
INTERCONNECTON DIAGRAMS .....................................................................S-1
Summary of Contents for CSH-23
Page 1: ...COLOR SCANNING SONAR MODEL CSH 23 23F 24 24F Back ...
Page 9: ...4 Figure 3 2 Maintenance space example sonar compartment ...
Page 17: ...12 4 WIRING 4 1 Cable Configuration Figure 4 1 Cable configuration ...
Page 53: ...A 4 ...
Page 54: ...A 5 ...
Page 61: ...A 12 ...
Page 71: ...A 22 ...
Page 72: ...A 23 ...
Page 73: ...A 24 ...
Page 74: ...A 25 ...
Page 75: ...A 26 ...
Page 76: ...A 27 ...
Page 77: ...A 28 ...
Page 78: ...A 29 ...
Page 79: ......
Page 80: ...D 2 ...
Page 81: ...Y Hatai D 3 ...
Page 82: ...D 4 ...
Page 83: ...Oct 31 03 D 5 ...
Page 84: ...D 6 ...
Page 85: ...D 7 ...
Page 86: ...D 8 ...
Page 87: ...Dec 10 02 D 9 ...
Page 88: ...D 10 ...
Page 89: ...D 11 ...
Page 90: ...D 12 ...
Page 91: ...D 13 ...
Page 92: ...D 14 ...
Page 93: ...D 15 ...
Page 94: ...D 16 ...
Page 96: ...S 2 ...