INSTALLATION - 2
SECTION 2 - INSTALLATION
Prior to delivery of the boiler, consideration should be given to the following:
(Planning regulations may call for more consents than those listed below, always check with your
Local Planning Authority).
A. Local Planning consents where appropriate.
B. Consideration given to access for delivery and positioning of the boiler.
C. Preparation of a suitable base, which must be able to support the total weight of the system
under operating conditions.
The locations of services to the site required for the system, under operating conditions.
D. Electricity supply, check the loading required/available.
E. Drainage system, check the suitability of the drainage system.
F. Local regulations for discharge into existing drains.
G. Suitable access for delivery and off-loading.
H. Safe access to the plant when installation is complete.
2.1
GENERAL
The installation of a VMP fuel fired steam boiler should be carried out by competent personnel in
accordance with all relevant safety regulations. It is the responsibility of the installer to ensure that
these regulations are complied with.
The requirements and instructions contained in this section generally relate to the boilers being
installed to operate on natural/manufactured gas.
Where the boiler is to operate on L.P. Gas, special reference should be made to
Section 2.10.1 -
Gas Supply
, and
Section 2.10.1.3 L.P. Gas
.
2.2
PRE-INSTALLATION
The customer should examine the equipment for any damage. It is the responsibility of the installer
to ensure all parts supplied with the equipment are fitted in a correct and safe manner.
2.2.1
RECEIVING INSPECTION