VMP-IOMM-2018-2
Fulton Ltd
Page 3
INTRODUCTION - 1
Figure. 2 - General Arrangement Top
1. Boiler pressure gauge
2. Burner scroll (air intake)
3. Water bottle containing water level probes
4. Control panel door lock
5. Water bottle blowdown valve
6. Control box isolator switch
7. Operating pressure control switch
8. Main boiler blowdown front
9. Air pressure switch
10. Boiler name plate
11. Main steam stop valve
12. Water level gauges (sight glass)
13. Water level gauges blowdown valves
14. Boiler control panel
15. System controls (blowdown/TDS)
16. Clean out handhole (water jacket)
17. Clean out door (furnace)
18. Feedwater inlet
19. Main boiler blowdown back
20. Monobloc gas valve
21. Gas train
22. Boiler safety valve
23.
Burner flame sensor
24.
Main flame observation
25. Fuel lines - oil
Key
20
21
24
23
22
25
24
23
25