VMP-IOMM-2018-2
Fulton Ltd
Page 7
Figure. 4 - Typical Installation (GAS)
VMP
Gas Fired
Shut Off
Valve
Check Valves
Fast Opening
Valve
Blowdown
Valve
Safety Valves
Water Column
and
Sight Glass
Fast Opening
Valve
Blowdown
Valve
TYPICAL BOILER INSTALLATION
(Design and Layout will change with Boiler Specification)
Vent
Cold Water Supply
Sight Glass
Vent
Condensate
Return Tank
Discharge
To Drain
Blowdown
Separator
Shut Off
Valve
Cold Water Inlet
Drain
Pump/Strainer
VMP
Gas Fired
Shut Off
Valve
Check Valves
Union
Fast Opening Valve
Blowdown Valve
Safety Valves
Water Column and
Sight Glass
Fast Opening Valve
Blowdown Valve
Check
Valve
Return