VMP-IOMM-2018-2
Fulton Ltd
Page 9
INSTALLATION - 2
2.4.2.2
WATER BOTTLE
Boilers are supplied with two water bottles containing the water level and pump on/off probes.
The water bottle blowdown cock should be connected to the auxiliary blowdown line.
1st. Low water
probe (blue)
Pump off (grey)
Pump on (black)
2nd. Low water
probe (brown)
2.4.2.1
MAIN BOILER BLOWDOWN VALVE
The main blowdown connection is via a branch pipe.
Figure. 5 - Boiler Blowdown
Feedwater inlet
Rear Boiler
blowdown
Front Boiler
blowdown
Figure. 6 - Typical Water Bottle