EP18-72-IOMM-2015-7
Fulton Ltd
Page 38
MAINTENANCE - 4
DAIL
Y
TESTS
1
2
3
4
5
6
7
Date
1.
v
isual Inspection
of
casing
exterior
pipework
and
fittings
for
signs
of
leakage
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
2.
Low W
ater Level Check
-
low water indicator illuminates, alarm sounds and feedwater pump
stops/starts.
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
3.
Blowdown, Boiler
Duration seconds.
Test T
ime.
4.
Pressure gauge
reading for blowdown tests.
Boiler water and water treatment values must be within known tolerances of the datum.
5.
Boiler W
ater
.
datum value.
TDS.
reading
datum value.
PH
reading
6.
Oxygen Scavenger
Concentration
datum value.
reading
7.
Brine level correct
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
Y -
N
WEE
k
L
Y
TESTS
7+
8.
v
isual Inspection
of
casing
interior
pipework,
fittings
and
elements
for
signs
of
leakage
Y -
N
9.
Pump T
est
- Feedwater pump, start/stop
Y -
N
10.
Safety valve outlet pipe
to safe blowdown point and free of damage
Y -
N
T
est results and actions taken
Day
1.
sig.
Day
5.
sig.
2.
sig.
6.
sig.
3.
sig.
7.
sig.
4.
sig.
7+.
sig.
Log exam
ined by:
Date:
Electric Steam Boiler - Daily and W
eekly T
ests
Model:
Boiler Number: