Technical Support is available from 8am to 5pm (PST) M - F at [email protected].
68
REQUIRED PARTS AND TOOLS:
2.5mm Hex Wrench (included with accessories)
1. BELT INSTALLATION STEPS:
Power Off Machine. Power off and unplug your unit. Wait at least 1 hour for capacitors to discharge.
2. Disconnect Water:
Detach the tubes from the rear connectors. Use the small piece of tubing
that shipped with your laser to shunt the two water bulkheads together.
3. Loosen Retaining Screws:
Loosen or remove the M3 retaining screws and washers so that
the old belt can be removed and discarded.
4. Mount Belt:
Run each end of the new belt through the mounting slot with the teeth on the inside
of the closed loop. The ends of the belt should protrude by approximately 3 teeth (6mm) through the
slot. Make sure that the belt forms a flat, closed loop.
5. Tighten Retaining Screws:
Tighten the M3 retaining screws to secure and retain the belt.
Starting the thread with your fingers can speed the process up.
6. Loosen the idler pulley mount:
Once the belt has been installed on the riser, loop over the
drive and idler pulleys.
7. Tension the belt:
Pull on the Y idler pulley mount with your hand. Moderate to strong force is
recommended. If the motors do not jog, verify that the motors are connected to the control card.
Belt Installation
The belts on your laser system are a consumable item and will eventually stretch beyond a usable
length or break. You can contact Full Spectrum Laser support for replacements.
SHOCK WARNING!
The capacitors in the power supply
retain power even after turning the laser off. To ensure your
safety, turn off the laser, remove the power cord and wait at
least 1 hour before accessing the power supply.
WATER WARNING!
You will be disconnecting the water
system and working with the laser upside down. Be sure the
machine is dry before proceeding with this process.