64
Operating manual
RX
300 S6
Connecting the server to the power source
I
A phase redundancy in the power supply of the server can be set up if
two hot-plug power supply units are installed.
In this case, each of the power supply units is either connected to two
different phases or to two separate circuits of the internal power supply
network.
4.4.1.2
Using cable ties
You can secure the power cable using a cable tie to ensure that the insulated
connector cannot be disconnected from the server accidentally. The cable tie is
included in the accessories pack that is delivered together with the server.
Figure 17: Using cable ties
Ê
Thread the cable tie through the eye.
Ê
Pull the cable tie tight to secure the power cable.
The insulated connector cannot now be disconnected from the server
accidentally.
I
You can loosen the cable tie by opening the small lock.
Summary of Contents for PRIMERGY RX300 S6
Page 1: ...Operating manual English PRIMERGY RX300 S6 Operating manual Edition March 2011 ...
Page 6: ...Operating manual RX 300 S6 ...
Page 10: ...Operating manual RX 300 S6 9 Appendix server specification 121 Index 125 ...
Page 86: ...86 Operating manual RX 300 S6 Cleaning the server ...
Page 88: ...88 Operating manual RX 300 S6 BIOS Setup security functions ...
Page 120: ...120 Operating manual RX 300 S6 Opening closing the housing ...
Page 130: ...130 Operating manual RX 300 S6 ...