RX300 S6
Operating manual
55
Installing/removing the server in/from the rack
Preparing the server
I
For the Japanese market:
Refer to the "Rack Mounting Guide" for more detailed explanation and for
other support systems.
Figure 11: Preparing the server
Ê
Place the outer telescopic rails on the sides of the server (see arrow 1 in
figure 11
).
Ê
Slide the outer telescopic rails forwards to secure them (see arrow 2 in
figure 11
).
2
1
Summary of Contents for PRIMERGY RX300 S6
Page 1: ...Operating manual English PRIMERGY RX300 S6 Operating manual Edition March 2011 ...
Page 6: ...Operating manual RX 300 S6 ...
Page 10: ...Operating manual RX 300 S6 9 Appendix server specification 121 Index 125 ...
Page 86: ...86 Operating manual RX 300 S6 Cleaning the server ...
Page 88: ...88 Operating manual RX 300 S6 BIOS Setup security functions ...
Page 120: ...120 Operating manual RX 300 S6 Opening closing the housing ...
Page 130: ...130 Operating manual RX 300 S6 ...