42
Operating manual
RX
300 S6
Notes on installing the server in the rack
3.6
Notes on installing the server in the rack
V
CAUTION!
●
For safety reasons, at least two people are required to install the
server in the rack because of its weight and size.
(For the Japanese market, please refer to "
安全上の注意およびその
他の重要情報
".)
●
Never lift the server into the rack using the handles on the front panel.
●
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical
manual for the corresponding rack. The technical manual is supplied
with the corresponding rack.
●
When installing the rack, make sure that the anti-tilt mechanism is
correctly fitted.
●
For safety reasons, no more than one unit may be removed from the
rack at any one time during installation and maintenance work.
●
If several units are simultaneously removed from the rack, there is a
risk that the rack could tip over.
●
The rack must be connected to the power supply by an authorized
specialist (electrician).
●
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the
power supply's fuse protection must comply with the requirements for
non-industrial power supply networks for the type A connector.
Summary of Contents for PRIMERGY RX300 S6
Page 1: ...Operating manual English PRIMERGY RX300 S6 Operating manual Edition March 2011 ...
Page 6: ...Operating manual RX 300 S6 ...
Page 10: ...Operating manual RX 300 S6 9 Appendix server specification 121 Index 125 ...
Page 86: ...86 Operating manual RX 300 S6 Cleaning the server ...
Page 88: ...88 Operating manual RX 300 S6 BIOS Setup security functions ...
Page 120: ...120 Operating manual RX 300 S6 Opening closing the housing ...
Page 130: ...130 Operating manual RX 300 S6 ...