
Figure 202: Installing the system board (B)
▶
Fasten the system board with 12 screws (see circles).
▶
For Japan / APAC / North America only:
Replace the CMOS battery installed on the new system board with a new
CMOS battery (see
"Replacing the CMOS battery" on page 244
), because
charging of CMOS battery might be reduced during stocked in warehouse.
▶
Remove the heat sink with the CPU from the defective system board, see
"Replacing a CPU or heat sink" on page 167
.
▶
Remove the protective plastic cover from the CPU socket of the new system
board and fit it onto the socket of the defective system board which will be
sent back to spares.
Returned system boards without this cover probably have to be
scrapped.
▶
Install the heat sink with the CPU on the new system board, see
System board and components
250
Upgrade and Maintenance Manual
GX2570 M6
Summary of Contents for PRIMERGY GX2570 M6
Page 66: ...Basic hardware procedures 66 Upgrade and Maintenance Manual GX2570 M6 ...
Page 78: ...Basic software procedures 78 Upgrade and Maintenance Manual GX2570 M6 ...
Page 154: ...Expansion cards and riser modules 154 Upgrade and Maintenance Manual GX2570 M6 ...
Page 188: ...Graphic processor GPU 188 Upgrade and Maintenance Manual GX2570 M6 ...
Page 234: ... Switching on the server on page 49 Midplane kit 234 Upgrade and Maintenance Manual GX2570 M6 ...
Page 242: ...Front panel 242 Upgrade and Maintenance Manual GX2570 M6 ...
Page 252: ...System board and components 252 Upgrade and Maintenance Manual GX2570 M6 ...
Page 274: ...Appendix A 274 Upgrade and Maintenance Manual GX2570 M6 ...
Page 281: ...AIOM adapter Card AIOM adapter Card AOM 438G AIOM P VGA Port C11 JVGA1 ...