CX400 M4
Operating Manual
51
Starting up
Attaching the carrier rails to the server enclosure
Ê
Identify the right and the left rail.
Figure 15: Attaching the right carrier rail
Ê
Move the right carrier rail towards the server enclosure and position the
holes onto the positioning screws (1).The carrier rail must lock in the
corresponding hole.
Ê
Push the carrier rail towards the front side until it locks into the supporting
holes nicely (2).
Figure 16: Fixing the carrier rail
Ê
Fasten the carrier rail with two M4 screws (3).
Ê
Repeat this procedure to install the left carrier rail.
Summary of Contents for PRIMERGY CX400 M4
Page 6: ...Operating Manual CX400 M4 ...
Page 10: ...10 Operating Manual CX400 M4 Introduction ...
Page 14: ...14 Operating Manual CX400 M4 Before you start ...
Page 42: ...42 Operating Manual CX400 M4 Important information ...
Page 74: ...74 Operating Manual CX400 M4 Operation ...
Page 82: ...82 Operating Manual CX400 M4 Technical data ...
Page 84: ...84 Bearbeitungsstand Bestellnummer Warranty and service ...