
Table
2-9
Cooling
conditions
(continued)
Configuration
Input
voltage
CPU
type
Region
Maximum
heat
dissipation
Maximum
exhaust
airflow
Outside
Japan
2,900
kJ/hr
(2,750
BTU/hr)
200
to
240
VAC
SPARC64
X
Japan
2,820
kJ/hr
(2,670
BTU/hr)
Outside
Japan
2,660
kJ/hr
(2,520
BTU/hr)
SPARC64
X+
Japan
2,970
kJ/hr
(2,810
BTU/hr)
Outside
Japan
2,820
kJ/hr
(2,670
BTU/hr)
SPARC
M10-4
200
to
240
VAC
SPARC64
X
Japan
10,410
kJ/hr
(9,864
BTU/hr)
17.1
m
3
/min
Outside
Japan
9,954
kJ/hr
(9,434
BTU/hr)
SPARC64
X+
Japan
11,550
kJ/hr
(10,950
BTU/hr)
18.7
m
3
/min
Outside
Japan
11,100
kJ/hr
(10,520
BTU/hr)
SPARC
M10-4S
200
to
240
VAC
SPARC64
X
Japan
10,460
kJ/hr
(9,912
BTU/hr)
17.1m
3
/min
Outside
Japan
10,000
kJ/hr
(9,482
BTU/hr)
SPARC64
X+
Japan
12,330
KJ/hr
(11,690
BTU/hr)
18.7m
3
/min
Outside
Japan
11,880
KJ/hr
(11,260
BTU/hr)
Configuration
including
only
expansion
rack
1
(*1)
200
to
240
VAC
(*2)
-
-
4,876
kJ/hr
(4,622
BTU/hr)
29.8
m
3
/min
200
to
240
VAC
(*3)
-
-
4,876
kJ/hr
(4,622
BTU/hr)
380
to
415
VAC
(*4)
-
-
4,876
kJ/hr
(4,622
BTU/hr)
Configuration
including
expansion
rack
2
(*1)
200
to
240
VAC
(*2)
-
-
6,316
kJ/hr
(5,988
BTU/hr)
29.8
m
3
/min
200
to
240
VAC
(*2)
-
-
6,316
kJ/hr
(5,988
BTU/hr)
380
to
415
VAC
(*4)
-
-
6,316
kJ/hr
(5,988
BTU/hr)
PCI
expansion
unit
AC100
-
120
V
-
-
1,005
kJ/hr
(953
BTU/hr)
4.5
m
3
/min
200
to
240
VAC
-
-
972
kJ/hr
(921
BTU/hr)
*1
The
SPARC
M10-4S
is
not
mounted.
*2
Value
for
the
single-phase
power
feed
model
*3
Value
for
the
three-phase
delta
power
feed
model
*4
Value
for
the
three-phase
star
power
feed
model
Fujitsu
M10/SPARC
M10
Systems
Installation
Guide
・
July
2015
42
Summary of Contents for M10 Series
Page 1: ...Fujitsu M10 SPARC M10 Systems Installation Guide Manual Code C120 E678 12EN July 2015 ...
Page 10: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 x ...
Page 156: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 142 ...
Page 176: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 162 ...
Page 208: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 194 ...
Page 240: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 226 ...
Page 252: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 238 ...
Page 290: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 276 ...
Page 310: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 296 ...
Page 336: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 322 ...
Page 368: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 354 ...
Page 374: ...Fujitsu M10 SPARC M10 Systems Installation Guide July 2015 360 ...