![Fuji Electric FVR-C11S-7EN Series Instruction Manual Download Page 34](http://html1.mh-extra.com/html/fuji-electric/fvr-c11s-7en-series/fvr-c11s-7en-series_instruction-manual_2341873034.webp)
2-20
2 Installation and Connection
FVR-C11S-EN
2
Figure 2-3-13 Connection example of PLC terminal (when analog signal is input from PLC)
1) Set SW7 at CM.
2) With this connection, the power is supplied from the PLC power supply to the external thermal O/L relay.
So, OH2 trip is activated by PLC power-off with the inverter turned on.
3) To prevent inverter trip with OH2 when the PLC power being turned off, do not select the THR terminal function and
use the inverter electronic thermal O/L relay.
5) Connection to PLC (When analog signal is input from PLC)
When SW7 is set at P24, poly switch (F1) activates a current limit to
turn the power off.
12
V
U
W
13
11
30C
30B
30A
P1
P(+)
N(-)
P(+)
M
FM
C1
+10VDC
250
22k
0V
G
G
DC24V
STOP
RUN
PRG
RESET
FUNC
DATA
3
L1/L
L2/N
FWD
X1
X2
REV
P24/
CM
X3
0V
P24
CM
SW7
CM
SW7
F1
4.7k
P24
(THR)
Frequency setting POT (VR)
MCCB
External thermal relay
To X3
terminal
To
output
terminal
of PLC
Single-phase
200V input
series
200 to 240V
50/60Hz
+24 to +27 VDC
To ground terminal
Pulse output
External
thermal
O/L relay
DC24V :
PLC power supply
PLC
Analog
meter
Alarm output for
any fault
Analog
monitor
To ground
terminal
To 11 terminal
CAUTION