INZ-TN1ZSS-E
- 35 -
(3) Mount the removed receiver box and transmitter box using the hexagonal bolt.
(4) Provide the receiver/transmitter cable (for calibration) or the cable between control unit and receiver
unit (for calibration).
(5) Wiring should be performed as following figure.