TROUBLESHOOTING
49
Problem: Cured foam is streaked or has excessively coarse or "glassy" cell structure.
Probable causes:
1. A-SIDE and B-SIDE chemicals are too cold for operation.
2. Poor mix.
3. Water or solvent in air purge line or residual solvent in gun head.
Corrective actions:
1. Reduce pressure to 150 PSI in cylinders and bring to proper operating temperature. Chemical
cylinders should be in area where temperature maintained is a minimum of 80°F(±5°F) and
preferably at recommended operating temperature for the specific system. After cylinders
are at operating temperatures, re-pressurize cylinders. (See p. 31)
2. Check and make sure Mix Tube is unclogged. Add a slight amount of air for mixing.
3. Attach water trap to air system. Check airline for dryness and blow out excessive water before
foaming desired part. Verify air dew point is 50°F or less. Verify refrigerant dry is working properly.
Problem: Foam collapses or fails to "cure" or become "Tack-Free."
Probable causes:
1. Chemical flow problem indicating a drastic off-ratio condition.
2. Chemical is too cold.
Corrective actions:
1. See previous problems on restrictions from one side (A or B) at a time. Review and take
corrective actions.
2. Reduce pressure to 150 PSI in cylinders and bring to proper operating temperature. Chemical
cylinders should be in area where temperature maintained is a minimum of 80°F(±5°F) and
preferably at recommended operating temperature for the specific system. After cylinders
are at operating temperatures, re-pressurize cylinders. (See p. 31)
Problem: Foam density is excessively high.
Probable causes:
1. Chemical is too cold.
2. B-SIDE flow restricted from cylinder.
3. Ambient temperature excessively cold.
Corrective actions:
1. Reduce pressure to 150 PSI in cylinders and bring to proper operating temperature. Chemical
cylinders should be in area where temperature maintained is a minimum of 80°F(±5°F) and
preferably at recommended operating temperature for the specific system. After cylinders
are at operating temperatures, re-pressurize cylinders. (See p. 31)
2. Check ratio and examine Mix Cartridge, B-SIDE and A-SIDE check valves, and flow controllers.
3. Warm foaming area with space heater. DO NOT APPLY DIRECT HEAT TO CYLINDERS.
www.foamsupplies.com
|
www.ecomatetechnology.com
|
1.800.325.4875
Summary of Contents for PROFESSIONAL Series
Page 2: ...www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 7: ...PROCESS DESCRIPTION ...
Page 10: ...5 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 11: ...EQUIPMENT DESCRIPTION ...
Page 16: ...11 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 17: ...CHEMICAL PREPARATION STORAGE HANDLING ...
Page 21: ...INSTALLATION ASSEMBLY ...
Page 24: ...19 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 25: ...PRODUCTION AND QUALITY CONTROL ...
Page 32: ...27 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 34: ...29 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 35: ...CHANGING CHEMICAL CYLINDERS ...
Page 40: ...35 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 41: ...MAINTENANCE ...
Page 49: ...TROUBLESHOOTING ...
Page 57: ...SAFETY HANDLING ...
Page 62: ...57 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 63: ...EQUIPMENT DRAWINGS PARTS ...
Page 64: ...59 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...