PRODUCTION AND QUALITY CONTROL
21
Quality Control (Q.C.) procedures are of utmost importance in manufacturing operations. Following the
procedures will assure the quality of urethane foam in the product. The procedures are as follows:
1. SLUG PRO START-UP PROCEDURE
2. RATIO PROCEDURE
3. THROUGHPUT PROCEDURE
4. REACTION PROFILE
a) String-Gel
b) Tack-Free
c) Density
5. SHOT TIME PROCEDURE
6. SHUT DOWN PROCEDURE
The following items are needed:
• Stopwatch
• Gram scale
• 30-gallon plastic bags
• Thin wire (e.g. coat hanger)
• Calculator
www.foamsupplies.com
|
www.ecomatetechnology.com
|
1.800.325.4875
Summary of Contents for PROFESSIONAL Series
Page 2: ...www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 7: ...PROCESS DESCRIPTION ...
Page 10: ...5 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 11: ...EQUIPMENT DESCRIPTION ...
Page 16: ...11 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 17: ...CHEMICAL PREPARATION STORAGE HANDLING ...
Page 21: ...INSTALLATION ASSEMBLY ...
Page 24: ...19 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 25: ...PRODUCTION AND QUALITY CONTROL ...
Page 32: ...27 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 34: ...29 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 35: ...CHANGING CHEMICAL CYLINDERS ...
Page 40: ...35 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 41: ...MAINTENANCE ...
Page 49: ...TROUBLESHOOTING ...
Page 57: ...SAFETY HANDLING ...
Page 62: ...57 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...
Page 63: ...EQUIPMENT DRAWINGS PARTS ...
Page 64: ...59 www foamsupplies com www ecomatetechnology com 1 800 325 4875 ...