56
Open the gas cylinder valve
Set the shielding gas flow rate:
If there is a "Gas test" button:
-
Press and release the "Gas test" button
-
Turn the adjusting screw on the underside of the pressure regulator until the pres-
sure gauge shows the required gas flow rate
-
Press and release the "Gas test" button again
If there is no "Gas test" button:
-
Press the "Mode" button to select 4-step mode
-
Set the "Ito" parameter to "Off" in the Setup menu
-
Disengage the feed rollers
-
use the robot to set the welding start-up or gas test signal
-
turn the adjusting screw on the underside of the gas pressure regulator until the
pressure gauge shows the required shielding gas flow rate
-
cancel the welding start-up or gas test signal
-
engage the feed rollers
use the robot to set the welding start-up signal and initiate welding
Corrections dur-
ing welding
To obtain the best possible welding results, the arc-force dynamic parameter will some-
times need to be adjusted.
Press the "Parameter selection" button to select the arc-force dynamic parameter
Use the adjusting dial to set the desired arc-force dynamic value
The welding parameter value is shown in the digital display located above it.
CAUTION!
Risk of injury and damage from electric shock and from the wire
electrode emerging from the torch. If the welding start-up signal is set:
-
keep the welding torch away from your face and body
-
do not point the welding torch at people
-
make sure that the wire electrode does not touch any conductive or
earthed parts, such as the housing, etc.
CAUTION!
Risk of injury and damage from electric shock and from the wire
electrode emerging from the torch. If the welding start-up signal is set:
-
keep the welding torch away from your face and body
-
do not point the welding torch at people
-
make sure that the wire electrode does not touch any conductive or
earthed parts, such as the housing, etc.
7
8
9
1
2
Summary of Contents for TransSteel 3500 Rob
Page 2: ...2...
Page 4: ...4...
Page 8: ...8...
Page 20: ...20...
Page 21: ...General information...
Page 22: ......
Page 27: ...Control elements and connections...
Page 28: ......
Page 35: ...Installation and commissioning...
Page 36: ......
Page 46: ...46...
Page 47: ...Welding...
Page 48: ......
Page 61: ...61 EN Number 3 Number 4 Number 5...
Page 62: ...62...
Page 63: ...Setup settings...
Page 64: ......
Page 76: ...76...
Page 77: ...Troubleshooting and maintenance...
Page 78: ......
Page 99: ...Appendix...
Page 100: ...100 Spare parts list TSt 3500 Rob TSt 5000 Rob...
Page 102: ...102...
Page 103: ...103...