61
EN
Replace wearing parts
General
Instructions for
storing and load-
ing process tapes
To guarantee that the process tapes remain in top quality condition, please note the follow-
ing recommended environmental conditions for storage:
-
Store process tapes only in the original packaging (vacuum packed)
-
The temperature in the storage location should not exceed 35°C (95°F)
When loading a new process tape note the following:
-
Do not remove process tapes from their packaging until they are required
-
Wear oil and grease free gloves
-
Dust and dirt free environment
-
Do not touch adhesion points
* aluminium side
Load new proc-
ess tape
WARNING!
Work that is carried out incorrectly can cause serious injury or dam-
age. All work must be carried out by trained and qualified personnel in compliance
with the relevant safety regulations. Note the safety rules in the operating instruc-
tions.
IMPORTANT!
Check electrodes for wear and replace if necessary each time a new proc-
ess tape is loaded.
Material
Process tape
Tape ma-
terial
Heat input from
exterior sur-
roundings
Process
tape length
Deep drawn steel, ungalva-
nised
Deep drawn steel galva-
nised
CrNi
PT 2000
Copper
low
52 m (174 ft.)
High-strength and ultra-
strong steel, drill steel
PT 1205
PT 2000
PT 2110
Steel
Copper
Copper
medium
low
low
70 m (230 ft.)
52 m (174 ft.)
52 m (174 ft.)
AI 99
AIMg3
AIMg5
PT 1407
Steel
medium
70 m (230 ft.)
AIMgSi
PT 1200
Steel
medium
70 m (230 ft.)
Steel / aluminium
PT 3000*
CrNi
high
52 m (174 ft.)
CAUTION!
Risk of injury from springiness of spooled process tape. To avoid in-
juries caused by the process tape springing back, hold the end of the tape firmly
when fitting it.
CAUTION!
Danger of injury from sharp-edged process tape. Wear safety gloves
when working with process tape.
Summary of Contents for DeltaSpot
Page 2: ...0...
Page 4: ...2...
Page 16: ...14...
Page 17: ...General information...
Page 18: ......
Page 22: ...20...
Page 23: ...Control elements and connections...
Page 24: ......
Page 36: ...34...
Page 37: ...Start up...
Page 38: ......
Page 47: ...45 EN 1 6 1 2 3 7 1 1 8 1 9 1 2 10 1 11 11...
Page 54: ...52...
Page 55: ...Spot welding...
Page 56: ......
Page 60: ...58...
Page 61: ...Troubleshooting and maintenance...
Page 62: ......
Page 71: ...69 EN 3 11 Nm 3 4 4 5 5 5 6 24 Nm 6...
Page 74: ...72 Disposal Dispose of in accordance with the applicable national and local regulations...
Page 77: ...Appendix...