4 | Installation
20
M0741021_en | Installation and operating instructions Spring blade agitator FBR
4.3 Installing the spring blade agitator
4.3.1 Materials supplied
1
2x spring piles
13
Intermediate plate
2
Top part of gravity shaft
13a
2x cover plates
(for FBR 150)
3
Torque support
14
Support in the boiler room (option)
4
Geared motor
15
Adjustable feet
5
Feed screw
15a
Shorter adjustable feet
(optional for horizontal installation)
6
Trough cover - wood chips
(standard)
16
Gear supports
7
Trough cover - pellets (optional)
16a
Shorter gear supports
(optional for horizontal installation)
8
Raising plate for discharge without
raised floor
17
Extensions for gear supports (optional)
9
Trough open (store side)
18
Mitre gear
10
Transfer channel (hole in wall)
19
Spacer for rotary agitator head (for FBR
150)
11
Trough closed (boiler room side)
20
Accessories package
12
Rotary agitator head