6 | Servicing the system
42
M0741021_en | Installation and operating instructions Spring blade agitator FBR
No.
Component
Int.
Operation
7
Trough / dosing screw
r
Check the trough and dosing screw for dirt and damage
r
Check the screw blades for wear
8
Rotary plate
r
Check the rotary plate for material build-up and clean if
necessary
9
Mitre gear
r
Carry out a general visual inspection
Ä
No major oil leaks should be visible.
10
Clamping plate of the
spring piles
r
Check that the screws of the clamping plate are firmly
in position and tighten if necessary