![Fröling FBR Installation And Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/froling-0/fbr/fbr_installation-and-operating-instructions-manual_2338794022.webp)
4 | Installation
22
M0741021_en | Installation and operating instructions Spring blade agitator FBR
Ø 15mm
r
When the unit has been screwed together, insert it through the hole in the wall on the
store side
r
Align the rotary agitator head with the troughs in the store in accordance with the
installation diagram
Secure the rotary agitator head to the floor:
r
Make two holes each in the floor for the gear supports
r
Drill the holes marked
- Drill diameter: 15 mm
- Drill depth at least 105 mm
r
Insert the heavy duty anchors into the bore holes and tighten with a spanner (AF 17
mm)
Ø 15mm
r
Fit adjustable feet on both sides of the open trough
- 2x hexagonal screw M12 x 35 for each adjustable foot
r
Fit the closed trough with ceramic fibre seal to the transfer channel
- 4x hexagonal screw M12 x 35
Ä
Check the alignment of the flange plates!
Secure the adjustable feet to the floor:
r
Make a hole in the floor for the adjustable feet
r
Drill the holes marked
- Drill diameter: 15 mm
- Drill depth at least 105 mm
r
Insert the heavy duty anchors into the bore holes and tighten with a spanner (AF 17
mm)
r
Shorten the adjustable feet using an angle grinder so that the rotary agitator arms are
not obstructed